Re-Roofing in Tauranga
Old roof off, any rotten timber sorted, new roof on - and your house watertight before we leave at the end of every day. Longrun metal or asphalt shingle, anywhere in Tauranga and the Western Bay.
When It Is Time to Replace a Roof
Tauranga has an unusual amount of housing that went up in the 1960s and 70s, particularly through Otumoetai, Greerton, Gate Pa and Judea. A great many of those roofs are now hitting the end of their working life at roughly the same time, which is why re-roofing is the single biggest part of what we do.
These are the signs that a roof has moved past repair:
- The coating has gone chalky or is peeling across the whole roof, not just on one face. Once the paint system has failed the steel underneath is exposed and rust follows.
- Fixings are lifting in more than one place. One or two backing out is a repair. Dozens of them means the timber underneath has moved or the roof has been working loose for years.
- Rust around the fixings, the laps or the flashings, especially anywhere water sits after rain.
- Concrete tiles that are cracking, delaminating or losing their surface. Older concrete tile roofs shed their coating and go porous, and the extra weight of water they then hold is not doing your framing any favours.
- You have paid for repairs more than once in the last few years. At some point the repairs stop being cheaper than the replacement.
- Stains on the ceiling. By the time it shows inside, water has usually been getting in for a while.
None of these means you definitely need a new roof. We will come and look, and if it has ten good years left we will tell you that.
How a Re-Roof Actually Runs
Most homes are done inside a week. A straightforward single-storey house is often two to three days on the roof once the scaffold is up; a large or complex two-storey home can be a fortnight.
-
Scaffold and edge protection
Goes up first, on every job, single-storey included. It is what makes the work safe and it is also why the finished edges are neat - a roofer working off a ladder is not doing their best work.
-
Stripped in sections, closed in each day
We work across the roof in manageable sections rather than opening the whole house up at once, and everything is closed in and made watertight before we leave for the day.
-
Inspect and repair the timber
This is the part you are paying for that you will never see. Rotten purlins, damaged battens and previous bad repairs get sorted now, while the roof is off, because it costs almost nothing at this stage and a fortune later.
-
Underlay, then the new roof
New underlay, new flashings, new fixings. We do not reuse old flashings to save a few dollars - they are the parts that fail.
-
Spouting, clean-up and a walk around
New spouting if it is part of the job, all the old roofing taken away, a magnet run over the lawn and gardens for stray fixings, and a walk around with you at the end.
Choosing What Goes Back On
A re-roof is the one chance you get to change the look of the house, and it is worth thinking about rather than defaulting to the same thing that is up there now.
Longrun metal is the most common choice: best value per square metre, huge colour range, very long life when it is specified correctly for the coast. Asphalt shingles are much quieter in heavy rain and suit complex hip roofs and character homes. Architectural tray is the premium option where the roof is a design feature.
One thing worth knowing: replacing concrete tile with metal takes a lot of weight off the structure, which is generally a good thing, but going the other way needs the framing checked first. We will raise it if it applies to your house.
Not Sure Whether Yours Needs Replacing?
We will come and get up on it, take photographs of anything you cannot see from the ground, and give you an honest answer - including when the answer is that you do not need us yet.
Book a free roof inspection
Re-Roofing Questions
Do I have to move out while my roof is replaced?
No. People stay in the house for almost every re-roof we do. It is noisy during the day and there will be scaffolding around the house, but the building stays weathertight throughout and your power and water are unaffected.
What happens if it rains part way through?
Nothing, because we only strip what we can close in that day. That is the whole reason we work that way. If a genuine downpour arrives mid-afternoon we stop stripping and finish closing in what is already open.
Do I need consent to re-roof?
Replacing a roof with a comparable product is usually exempt building work under Schedule 1 of the Building Act, but it is not automatic - changing to a substantially different or heavier material, altering the structure, or work on a heritage building can all need consent. We will tell you what we think applies to your job and, if there is any doubt at all, point you at Tauranga City Council or Western Bay of Plenty District Council to confirm before we start.
Can you re-roof over the top of the existing roof?
It is occasionally possible and we generally advise against it. You cannot see or fix the timber underneath, you cannot tell what condition the old roof is really in, the extra weight is carried by framing that was not designed for it, and any moisture trapped between the two layers has nowhere to go. Stripping properly costs more up front and is the reason the new roof lasts.
How much does re-roofing cost in Tauranga?
It is decided by the roof rather than the house: the pitch, the number of valleys and penetrations, whether scaffold access is easy, what condition the timber is in, and which product goes back on. Two houses with the same floor area can differ enormously. We give you a written itemised quote after we have been on the roof, with scaffolding, disposal and GST shown separately.
What Else We Do
Everything below is roofing we do right across Tauranga and the Western Bay - new builds, replacements, repairs and maintenance, residential and commercial.
New Roofs
Roofing for new builds, extensions and architectural projects across Tauranga, booked around your build programme so the frame is not left sitting open. Read more
Longrun Metal Roofing
Corrugate and trapezoidal longrun in COLORSTEEL and Colorcote, rolled to the full length of the run so there is no end lap for Bay of Plenty rain to find. Read more
Asphalt Shingle Roofing
Laminated asphalt shingles over a fully sarked deck. Quiet in heavy rain, excellent on complex hip roofs, and a very different look to a metal roof. Read more
Architectural Tray Roofing
Standing seam and secret-fix tray in steel, aluminium, zinc and copper, plus matching wall cladding, for architecturally designed homes. Read more
Roof Repairs
Leak finding, flashing and fixing repairs, storm damage and lifted or cracked shingles, plus an honest answer on whether a repair is worth doing at all. Read more
Commercial Roofing
Warehouses, retail, schools and body corporate work across the Western Bay, programmed around your trading hours rather than ours. Read more
Spouting & Downpipes
Continuous and sectional spouting, downpipes, fascia and internal gutters, sized to actually carry a Bay of Plenty downpour rather than just to look right. Read more
Roof Painting
Wash, treat, prime and coat. The way to get another decade out of a structurally sound roof that has simply lost its colour. Read moreGet a Free Roofing Quote in Tauranga
Tell us what the job is and roughly where it is, and we will come out, get up on the roof and give you a written price. No obligation, and no pressure if you want to sit on it and think it over.
027 535 1148- [email protected]
- Based at Mount Maunganui, working across Tauranga and the Western Bay
- Monday to Friday, 8am to 5pm
Roof leaking right now? Ring rather than filling this in - we will get someone to you faster than an email gets read.